Klausul Contractors’ All Risks


D - 2 Endorsements

001 Strike, Riot and Civil Commotion
002 Cross Liability
003 Maintenance Visits
004 Extended Maintenance
005 Time Schedule
006 Overtime, Night Work and Express Freight
007 Airfreight
008 Structures in Earthquake Zones
009 Earthquake
010 Flood and Inundation
100 Testing of Machinery and Installations
101 Tunnels and Galleries
102 Underground Cables, Pipes and Other Facilities
103 Crops, Forests and Cultures
104 Dams and Water Reservoirs
105 Existing Structures and/or Surrounding Property
106 Sections
107 Camps and Stores
108 Construction Plant, Equipment and Machinery
109 Construction Material
110 Safety Measures
111 Removal of Debris from Landslides
112 Fire-Fighting Facilities and Fire safety on Constructions Sites
113 Inland Transit
114 Serial Losses
115 Designer’s Risk
116 Contract Works taken Over or Put Into Service
117 Water Supply and Sewer pipes
118 Drilling Work for Water Wells
119 Existing Property
120 Vibration
121 Piling Foundation end Retaining Wall Works

Subscribe to receive free email updates:

0 Response to "Klausul Contractors’ All Risks"